Offerings

Light-Duty Vehicles

The automotive industry has continued to see growing popularity in electrified options for fleet end users, often increasing lead time needed for placing purchase orders. We recommend reserving your slot on the production line before pricing is available. To do this please join our mailing list and watch this site.

If the vehicles are not listed on the Early Bird Reservation list, you can reach out directly to NAFG (National Auto Fleet Group) or use their website to build the vehicle. You must register with NAFG first to receive an online quote.

Charging Station Infrastructure

Charging station solutions provided by multiple Sourcewell vendors.

Charging 101
Plug-in electric vehicles can be charged using standard outlets (110V), which are called Level 1 charging. They can also be charged at Level 2 stations (240V), or at DC Fast Charge stations (480V).

Level 1 charging will charge a vehicle completely in 8 to 17 hours, depending on the size of the battery in the vehicle.

At a Level 2 station most vehicles will be fully charged in 4-10 hours. This 240V power is common in residential and commercial properties, also used for high energy-consuming appliances such as clothes dryers, heating/cooling, and cooking.

Finally, DC Fast Charging provides highest speed EV charging, capable of charging at 150+ kW speeds for larger battery vehicles (e.g. Medium and Heavy-Duty vehicles) or fast turnaround applications (e.g. en route charging).